Mooring berth

Dream toward the sea becomes reality.

Orient Shipyard & Engineering

Main Particular
Landing Pier245m
Alongside210m / 130m
UtilityElectric power(440v / 380v / 220v / 60Hz / 1,300kw), Fresh water, Sea water, Air, Co2, LPG
infrastructure for medium- and large-tonnage vessels, Proximity to floating docks for rapid transfer of vessels.

Dongha

Main Particular
Length80m
UtilityElectric shore power(440v, ~~), Fresh water, Sea water
Safe and spacious berth / Simultaneous mooring of several vessels / Convenient access for supplies and repairs.